Link to:
Population | Mayors / Reeves | Memorable Manitobans | Historic Sites | History Books | Maps | Contact Information | Sources
This municipality was named for its proximity to a hydroelectric power plant, built on the Winnipeg River in 1951.
Present Status
Town of Powerview-Pine Falls (1 May 2005)
Incorporation History
Village of Powerview (1 January 1951)
Amalgamation with Pine Falls (1 May 2005)Adjoining Municipalities
Land Area (square km)
?
Year
Total
1976
668
1981
691
1986
1781
1991
1559
1996
?
2001
?
Term
Mayor
1951-1956
H. J. Parent
1957-1958
E. P. Sherstone
1959-1960
Roy Cowan
1961-1962
S. Lazaruk
1963-1966
Mrs. J. L. Desilets
1967-1968
R. S. Papineau
1969-1970
A. Bruce
1971
George William Harbottle (1939-2012)
1972
?
1973-1984
Frank Jack Watson (c1921-2017)
1985-1989
Elie J. L. Trudell (1932-2010)
1990-1992
Francis J. Thibedeau
1993-2005
Henry Ostrowski Jr.
Search the MHS collection of biographies for ones connected to Powerview:
Custom Search
Go here for a list of historic sites in Powerview.
Geographic Names of Manitoba, Manitoba Conservation, 2000.
This page was prepared by Gordon Goldsborough.
Page revised: 28 November 2018