This firm was responsible for the design and construction of steel truss bridges around Manitoba in the early 20th century.
Period
President
1910
A. Y. Bain
Some of its construction work in Manitoba included:
Building
Location
Year
Status
Whitemud River, Municipality of WestLake-Gladstone
1908
Removed (?)
Fishing River, RM of Mossey River
1910
Louise Bridge (superstructure)
Red River, Winnipeg
1910
“Spur track through park,” Winnipeg Tribune, 16 May 1910, page 4.
This page was prepared by Gordon Goldsborough.
Page revised: 29 March 2023